NS | Updating Access Switch at Tudor Field and Herman Brown Hall

Scheduled Maintenance Report for Rice University

Completed

The scheduled maintenance has been completed.
Posted Nov 29, 2021 - 19:23 CST

Verifying

Verification is currently underway for the maintenance items.
Posted Nov 29, 2021 - 19:23 CST

In progress

Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Nov 29, 2021 - 18:01 CST

Scheduled

Beginning at 6:00pm this evening (11/29/21), a software upgrade will be performed on two network switches. This will address software defects that are impacting services. These two network switches provide services to the second floor of Tudor Field House (upgrade scheduled for 6:00pm) and to the second floor of Herman Brown Hall (upgrade scheduled for 6:30pm). Services will be impacted for an estimated 30 minutes while the upgrade is performed.
Posted Nov 29, 2021 - 11:18 CST
This scheduled maintenance affected: Network and Connectivity (Campus Connectivity, Internet Access, TV Services, VPN (Virtual Private Network), Wireless, Wired).